CONSTRUCTION AGREEMENT
PARTIES
-
This Construction Agreement (hereinafter
referred to as the “Agreement”) is
entered into on ________________ (the “Effective
Date”), by and between _Shri
Bajrang Lal S/o Shri Boudu Ram_, with an address of __Adhaar no. 780612347085_ (hereinafter
referred to as the “Party 1”), and _Shri Rajesh Kumar Soni S/o Shri
Hanuman Soni _(Adhaar no. 578098800838_, with an address of _House no. F9/432, Vishnu Marg, Chitrakoot
yojana sector 9, Vaishali Nagar Jaipur_ (hereinafter referred to as the “Party 2”) (collectively referred to as
the “Parties”).
CONSTRUCTION PROPERTY
- The Property that is to be constructed is located at the following address:
Not mentioning as it's just a draft.
Scope of Work
The Contractor agrees to perform the
following construction work as per the terms outlined below:
1. Cement: The cement used
for construction must be either UltraTech or Ambuja cement.
2. Bricks: The bricks used in
the project must be sourced from Kannota Gram, and no other type of bricks is
allowed.
3. Sand: Only Balochi sand is
permitted for use in this project.
4. Tiles and Granite: The
tiles used must range between Rs 40-50 per tile, and the design shall be
decided by the owner. Granite used must be priced at Rs 100 per square foot.
5. Iron Rods: The iron rods
for the project must be procured from either Sharma or Mangla companies.
6. Timber: The timber used
must be of high quality and properly treated.
7. Sunmica: The Sunmica used
must be priced at Rs 700 per square foot.
8. Door Fittings: Door
latches must cost less than Rs 300 per latch, and handle locks must be priced
at a minimum of Rs 3,500 each.
9. Electrical Cables: Only
Filonex company electrical cables will be used, and no other brand is
permitted.
10. Restroom Furniture and Tap
Installation: Restroom furniture should be installed within a budget of Rs
5,000, and taps should be installed at a cost of Rs 900.
11. Water Cooler: A water
cooler from European Command Company must be installed, with a budget not
exceeding Rs 10,000.
12. Sanitary Fittings:
Sanitary fittings must be from either Ashirwad or Kishan Marg brands, with no
substitutes allowed.
13. Terrace Tiles: Anti-skid
tiles must be installed on the terrace.
14. Terrace Wall: The
boundary wall on the terrace must be 4 feet above the terrace level.
15. Stair Railings: SS
railings priced at Rs 600 per railing must be installed on the stairs.
16. Putty: Either JK Lakshmi
or Birla Putty must be used.
17. Paint: The paint used
must be from either Asian Paints or ICI Paints.
18. Water Tank: A 750-liter
water tank must be installed, with the brand being either Sintex or Polycon.
19. Modular Kitchen and Wardrobe:
The contractor must install a modular kitchen and wardrobes as part of the
project.
20. Concealed Lighting:
Concealed floor lighting must be installed.
21. Air Conditioning: Split
air conditioners must be installed, with proper light points included.
22. Stairs: The stairs must
be made of granite, and footlights must be installed along the staircase.
23. Terrace Construction: On
the terrace, a bathroom with both Indian (Mamri) and Western (WC) toilets must
be built, along with a proper room in front of the bathroom.
24. Windows: All windows
installed must be 3-tier sliding windows.
25. Kitchen Exhaust Fan: An
exhaust fan must be installed in the kitchen.
26. Balcony: The balcony must
be 4 feet wide and must have railings identical to the balcony on the first
floor.
27. Washing Machine Platform:
A platform must be constructed near the terrace bathroom for the washing
machine.
28. Drainage System: After
the completion of construction, the contractor and mediator must inspect and
maintain the drainage system.
29. Water Supply: The
contractor is responsible for arranging water for construction purposes, but
may use electricity from the party without incurring additional charges.
30. Water Utilization: During
the construction work, the contractor must ensure the water is fully utilized
for optimal construction quality.
31. Additional Requirements:
If any additional points arise, the contractor must consult with the owner for
approval.
-
In addition to the aforementioned, the Constructor
agrees to abide by and perform all the work that is shown on the construction
plan available on the property’s site.
TERM
-
This
Agreement
shall be effective on the date of the signing this Agreement (hereinafter
referred to as the “Effective Date”)
and will end when the construction services are completed.
-
The term of this Agreement may be extended upon the provision of
written consent from both Parties.
-
The Parties agree that the Construction will
begin on _____________ and will end on or before _____________.
PAYMENT
AND FEES
-
The Parties agree that the total cost of the services will be _12,50,000
Rs only-,
where
____________ will be paid at the signing of this Agreement and ____________
will be paid at the completion.
-
The Parties agree that the Party 1st will provide an invoice to the Party 2nd
every ____________ days/months for the Services he/she completes.
-
The Parties agree that the means of payment will be via
__________________________________________________________________________________________________________________________________________________
USAGE
OF MATERIALS AND LABOR
-
The Parties agree that it is the Party 1st
responsibility to provide as well as pay for any labor and/or equipment needed
to complete the construction as per the Agreement.
-
The Parties further agree that the materials
used for the construction are to be as per above conditions.
ADDITIONAL
RESPONSIBILITIES OF THE Party 1st
The Party1st agrees to the
following:
1. To supervise, manage and complete
all the construction services as per the terms of Agreement.
2. To keep record of the documents
in a safe place accessible only to the Party 1st and the Party 2nd .
3. To take all necessary precautions
for all kinds of safety in general.
4. To bear responsibility for any
acts of negligence and emergencies and accidents.
6. To maintain the property, keep it
clean, and to safely dispose of hazardous materials and waste.
7. To train personnel on handling
hazardous materials and to be responsible for any illness, damage, or loss of
personnel.
INSURANCE
-
The Parties agree that it is the party 1st
responsibility to purchase an insurance
policy for the construction.
-
The Parties further agree that it is the
Client’s responsibility to maintain an insurance that covers replacement costs
in the event of fire, theft, act of nature and/or casualty(s).
TERMINATION
-
This Agreement may be terminated in case the
following occurs:
- Immediately
in case one of the Parties breaches this Agreement or one of the
conditions set forth in this Agreement .
- This
Agreement will automatically be terminated when both Parties complete
their obligations.
INDEMNIFICATION
-
The party 1st agrees to hold harmless as well as indemnify
its personnel, employees and others against all liabilities, expenses, claims
or other.
-
The Party 1st further agrees to be held responsible for
providing a defense against the aforementioned liability, claims and/or
demands, if any.
GOVERNING LAW
-
This Agreement shall be governed by
and construed in accordance with the laws of Jaipur.
AMENDMENTS
-
The Parties agree that any amendments made to this Agreement must
be in writing where they must be signed by both Parties to this Agreement.
As such, any amendments made by the
Parties will be applied to this Agreement.
ASSIGNMENT
-
The Parties hereby agree not to assign any of
the responsibilities in this Agreement to a third party unless consented to by
both Parties in writing.
ALTERNATIVE DISPUTE RESOLUTION
-
Any dispute or difference whatsoever arising out of or in
connection with this Agreement shall be submitted to
(Arbitration/mediation/negotiation) in accordance with, and subject to the laws
of Jaipur.
ENTIRE
AGREEMENT
-
This
Agreement contains the entire mutually decided conditions/terms and
understanding among the Parties hereto with respect to the subject matter
hereof, and supersedes all prior agreements, understandings, inducements and
conditions, express or implied, oral or written, of any nature whatsoever with
respect to the subject matter hereof, if any. The express terms hereof control
and supersede any course of performance and/or usage of the trade inconsistent
with any of the terms hereof.
- That If any work is found incomplete
or defective after the construction is finished, the party 1st
is responsible for fixing it for up to 1 year.
- The Party
1st has to rectify the defects at their own cost and cannot
charge extra for materials or labor.
SEVERABILITY
-
In an event where any provision of this Agreement is found to be
void and unenforceable by a court of competent jurisdiction, then the remaining
provisions will remain to be enforced in accordance with the Parties’
intention.
SIGNATURE
AND DATE
-
The Parties hereby agree to the terms and
conditions set forth in this Agreement and such is demonstrated throughout by
their signatures below:
CONSTRUCTOR Signature:_________________________ Date:_____________________________ |
CLIENT Signature:_________________________ Date:_____________________________ |